Cheltenham Renewable Energy & Solar Panels

Solar panels and other renewable electricity in Cheltenham: how many installations there are, how much power they produce, and the solar farms and battery sites planned nearby.

  • 3,590 renewable installations at the end of 2025
  • 14.5 MW of capacity
  • 12,875 MWh generated in 2025
  • 12 larger sites running within 12 miles

How Much Renewable Energy Does Cheltenham Have?

Almost all of Cheltenham’s renewable electricity comes from solar panels, most of them on the roofs of homes, schools and businesses. A compact town with little open land has almost no room for wind or solar farms of its own, so the larger projects sit in the countryside around it, particularly across the boundary in Tewkesbury borough.

This page shows how many renewable installations there are in Cheltenham, how much they can generate and how that has grown each year since 2014, and how the town compares with the rest of Gloucestershire. The map below shows every larger project within 12 miles of the town centre, from rooftop schemes and hospital batteries to solar farms, whether it is already running, approved or still in planning.

For how energy efficient the town’s homes are, see Cheltenham home energy ratings, and for how much gas and electricity they use, see Cheltenham gas and electricity use. If you drive electric, our EV charging points page maps where to charge in town.

Renewable Installations in Cheltenham

At the end of 2025 Cheltenham had 3,590 renewable electricity installations, 3,589 of them solar panels: about 67.9 for every 1,000 homes. Together they can produce 14.5 megawatts (MW) at full output, 3.2 times the 4.5 MW of 2014. In 2025 they generated 12,875 megawatt hours (MWh), equal to about 2.9% of all the electricity used in Cheltenham in 2024.

Technology Installations Capacity (MW) Generated (MWh)
Onshore Wind 1 0.01 Not published
Solar PV 3,589 14.46 12,875

Renewable Capacity by Year

Installed capacity (MW) at the end of each year

Year Installations Capacity (MW) Generated (MWh)
2025 3,590 14.46 12,875
2024 3,256 12.14 8,887
2023 2,898 10.51 7,759
2022 2,523 8.43 7,331
2021 2,349 7.51 5,760
2020 2,267 6.39 4,388
2019 2,227 6.89 6,045
2018 1,994 6.28 6,100
2017 1,973 6.12 5,479
2016 1,953 6.0 5,227
2015 1,896 5.51 4,630
2014 1,579 4.48 3,516

How Cheltenham Compares With Gloucestershire

With 67.9 installations for every 1,000 homes, Cheltenham ranks 5th of Gloucestershire's 6 districts. Figures are at the end of 2025.

District Homes Installations Per 1,000 Homes Capacity (MW) Solar (MW)
Forest of Dean 37,200 5,214 140.2 135.9 131.9
Tewkesbury 40,900 5,131 125.5 67.9 62.6
Stroud 52,400 5,679 108.4 97.3 73.1
Cotswold 40,600 3,423 84.3 104.3 99.3
Cheltenham 52,900 3,590 67.9 14.5 14.5
Gloucester 55,400 3,579 64.6 28.2 15.9

Solar Farms and Other Projects Near Cheltenham

Renewable electricity and battery storage projects of 150 kilowatts or more within 12 miles of the town centre, from the July 2026 planning database. 6 are in Cheltenham itself; the rest are in the neighbouring districts, mostly Tewkesbury borough.

Status Projects Capacity (MW)
Operational 12 114.3
Under construction 1 1.0
Approved 53 463.3
In planning 10 153.5
Refused, withdrawn or ended 12 126.1

All Projects Within 12 Miles

Project Technology Capacity (MW) Status Council Miles Updated Map
Ladies College Swimming Pool, Malvern Road - Solar Panels Solar 0.16 Approved Cheltenham 0.5 2024-07-08
Sandfields Care Home, St Georges Road - Solar PV Panels Solar 0.15 Approved Cheltenham 0.5 2023-10-25
St Pauls Medical Centre, Swindon Road - Solar Panels Solar 0.16 Approved Cheltenham 0.5 2024-03-04
Cheltenham General Hospital - Battery Energy Storage System Battery storage 2.19 Approved Cheltenham 0.6 2022-09-15
Big Yellow Self Storage, Princess Elizabeth Way - Solar Panels Solar 0.18 Approved Cheltenham 1.4 2024-09-09
All Saints Academy, Blaisdon Way - Solar Panel Solar 0.18 Approved Cheltenham 1.7 2025-12-16
Home Farm Solar 6.7 Operational Tewkesbury 2.5 2017-06-30
Hayden Hill Fruit Farm Solar 5.0 Refused, withdrawn or ended Tewkesbury 2.8 2016-05-04
Wingmoor Farm (Waste AD) Anaerobic Digestion 1.6 Operational Tewkesbury 3.2 2016-09-23
Anson Business Park, Cheltenham Road East - Solar Panels Solar 0.27 Approved Tewkesbury 3.6 2023-06-21
Meteor Business Park Battery storage 1.5 Operational Tewkesbury 4.0 2020-01-16
Safran Landing Systems Service Biomass 3.6 Operational Tewkesbury 4.0 2019-08-22
Land to the North of Cursey Lane Solar 4.0 Refused, withdrawn or ended Tewkesbury 4.2 2020-07-29
Safran Landing System, Down Hatherley Lane - Solar Panels Solar 0.26 Approved Tewkesbury 4.2 2023-06-02
Troughton Farm Solar 30.0 Operational Tewkesbury 4.5 2016-07-01
Tredington House Farm, Tredington - Battery Energy Storage Facility Battery storage 40.0 Approved Tewkesbury 4.9 2025-01-31
Claydon Farm Solar 18.2 Refused, withdrawn or ended Tewkesbury 5.2 2016-02-17
Brockworth Road - Battery Storage System Battery storage 20.0 Approved Tewkesbury 5.3 2024-05-30
David Lloyd Leisure, Whittle Way - Solar Panels Solar 0.21 Approved Tewkesbury 5.3 2026-01-26
Plant 1, G-Tekt Europe Manufacturing Limited -Roof Mounted Solar Panels Solar 1.0 Under construction Tewkesbury 5.4 2022-07-15
Hatherley Manor Hotel, Down Hatherley Lane - Solar Panels Solar 0.2 In planning Tewkesbury 5.5 2022-09-27
Tenpin Centre, Severn Barnwood Link Road - Solar Panels Solar 0.22 Approved Gloucester 5.5 2023-10-30
Laithwaites Wines, Gloucester Business Park - Solar Panels Solar 0.77 Approved Tewkesbury 5.6 2025-05-20
Tbs Engineering, Gloucester Business Park - Solar Panels Solar 0.53 Approved Tewkesbury 5.6 2023-05-26
Plant 4, Hurricane Road, Gloucester Business Park - Solar Panels Solar 1.0 Approved Tewkesbury 5.7 2022-07-15
The IO Centre, Gloucester Business Park - Solar Panels Solar 0.22 Approved Tewkesbury 5.7 2024-01-09
The Io Centre, Gloucester Business Park - Solar Panels Solar 0.25 Approved Tewkesbury 5.7 2022-11-29
Unilever UK - Solar Panels Solar 0.19 Approved Gloucester 5.7 2025-04-23
Unilever UK, Corinium Avenue - Solar Panels Solar 3.5 Approved Gloucester 5.7 2024-05-31
Claydon Farm - Solar Farm & Battery Storage Solar 49.9 Approved Tewkesbury 5.8 2021-12-17
Claydon Farm - Solar Farm & Battery Storage Battery storage 49.9 Approved Tewkesbury 5.8 2021-02-07
Sainsburys Supermarket - Solar Panels Solar 0.56 Approved Gloucester 5.8 2026-03-20
Cox's Brook Solar Farm - Solar Array Solar 16.0 Approved Tewkesbury 6.5 2026-02-16
Lower Stanley Farm Solar 4.0 Operational Tewkesbury 6.5 2017-02-02
Oxstalls Tennis Centre Solar 0.26 Approved Gloucester 6.6 2021-09-16
Walton Cardiff Manor Solar 2.0 Refused, withdrawn or ended Tewkesbury 6.6 2015-10-06
Morrisons Supermarket, Glevum Way - Solar Panels Solar Approved Gloucester 6.7 2023-10-09
Gloucester Royal Hospital - Solar Panels Solar 0.16 Approved Gloucester 6.9 2021-06-17
Moog Controls Factory Solar 0.38 Operational Tewkesbury 7.0 2024-02-15
Gloucester Road - Solar Carport Array Solar 0.22 Approved Tewkesbury 7.1 2022-01-28
Gloucester Royal Hospital - Battery storage Battery storage Approved Gloucester 7.1 2021-12-16
The Shirt Factory - Solar Panels Solar 0.16 In planning Gloucester 7.1 2025-04-04
The Shirt Factory - Solar Panels Solar 0.17 Approved Gloucester 7.1 2025-07-01
Bengrove Farm, Base Lane - Battery Storage Battery storage 49.9 In planning Tewkesbury 7.2 2022-12-12
Bengrove Farm, Base Lane - Solar Farm Solar 15.0 In planning Tewkesbury 7.2 2026-02-10
Bengrove Farm, Base Lane - Solar Farm Solar 15.0 Approved Tewkesbury 7.2 2025-09-16
Gloucester Academy Solar 0.2 Approved Gloucester 7.2 2022-05-19
Bruton Way - Solar PV Panels Solar 0.25 Approved Gloucester 7.3 2025-01-13
Dairy Way, Northway Lane, Unit 22 - Solar Panels Solar 0.59 Approved Tewkesbury 7.3 2026-05-12
Registry Twyver House, Bruton Way - Solar Panels Solar 8.8 Refused, withdrawn or ended Gloucester 7.3 2023-03-29
Northway Lane Waste Transfer Station Battery storage 7.0 Refused, withdrawn or ended Tewkesbury 7.4 2019-01-31
Quayside House - Solar Panels Solar Approved Gloucester 7.7 2021-09-29
Gloucestershire College - Photovoltaic Solar Panels Solar 0.64 Approved Gloucester 8.0 2021-11-01
Sudmeadow Road, Hempsted - Battery Energy Storage System Battery storage 49.99 Approved Gloucester 8.2 2026-01-02
Motus Commercials, Spinnaker Road - Solar Panels Solar 0.26 In planning Gloucester 8.4 2023-07-26
Hempsted Lane - Solar Array Solar 2.0 Approved Gloucester 8.5 2022-05-09
Maisemore - Solar Farm Solar 37.0 Approved Tewkesbury 8.6 2023-06-01
Over Farm Solar 9.9 Approved Tewkesbury 8.6 2019-11-14
Brookthorpe Solar Farm Solar 8.0 Approved Stroud 8.7 2026-02-16
Bristol Road Battery storage 20.0 Refused, withdrawn or ended Gloucester 8.9 2020-04-28
Hempsted Lane - Solar Array Solar 2.0 In planning Gloucester 8.9 2021-12-08
The Farm Consultancy Group Solar Approved Tewkesbury 9.0 2025-11-10
Guiting Manor Farms, Guiting Power - Solar Panels Solar 0.28 Approved Cotswold 9.1 2025-09-10
Linton Court Farm, Highnam - Battery storage Battery storage 99.9 Approved Tewkesbury 9.2 2023-09-08
Lassington Lane, Highnam - Battery Storage Battery storage 10.0 In planning Tewkesbury 9.5 2025-09-01
Lassington Lane, Highnam - Solar Farm Solar 40.0 In planning Tewkesbury 9.5 2025-09-01
Arlingham House, Quedgeley - Solar Panels Solar 0.28 Approved Gloucester 9.6 2021-11-11
Mobile Telephone Exchange (MTX) - Solar Panels Solar Operational Gloucester 9.7 2023-04-17
Murrells End Farm - Solar Arrays Solar 49.9 Refused, withdrawn or ended Forest of Dean 9.8 2022-06-17
Highnam Solar Farm Solar 5.0 Refused, withdrawn or ended Tewkesbury 9.9 2019-11-14
Two Mile Lane, Highnam - Solar Farm Solar 36.0 In planning Tewkesbury 10.0 2026-05-14
Alpha Colour Printers, Waterwells Drive - Solar Panels Solar 0.18 Approved Gloucester 10.2 2026-06-09
Francis And Lewis International, Waterwells Drive - Solar Panels Solar 0.17 Approved Gloucester 10.2 2022-12-01
Strensham Wind Cluster Onshore wind 6.0 Refused, withdrawn or ended Tewkesbury 10.5 2013-08-23
MG Markey Group, Quadrant Way - Solar panels Solar 0.32 Approved Stroud 10.6 2024-04-02
Unit Q1, Quadrant Distribution Centre, Hardwick - Solar Panels Solar 1.0 Approved Stroud 10.6 2022-05-09
Markley Group (Premiere Kitckens) Biomass Biomass 2.1 Operational Stroud 10.7 2012-05-01
All Alone Lane Battery storage Refused, withdrawn or ended Cotswold 11.0 2018-11-27
Home Farm Solar 25.0 Approved Tewkesbury 11.0 2026-02-27
Highleadon - Solar Arrays & Battery Storage Solar 49.9 Operational Forest of Dean 11.4 2026-04-24
Highleadon - Solar Arrays & Battery Storage Battery storage Operational Forest of Dean 11.4 2026-04-24
Home Farm Solar 25.0 Approved Wychavon 11.5 2026-02-27
Home Farm Battery storage Approved Wychavon 11.5 2026-02-27
Home Farm Battery storage Approved Wychavon 11.5 2026-02-27
Dobbies Garden Centres, Bath Road - Solar PV System Solar 0.2 Refused, withdrawn or ended Stroud 11.6 2023-12-05
Grove Farm - Microgrid of Solar Panels Solar In planning Malvern Hills 11.7 2025-09-19
Javelin Park EfW Energy from waste 14.5 Operational Stroud 11.7 2020-01-15
Lower Strensham - Battery Energy Storage Battery storage Approved Wychavon 11.9 2022-08-04

Frequently Asked Questions

What Is a Megawatt?

  • A megawatt (MW) is 1,000 kilowatts (kW), and measures how much power an installation can produce at full output. The average installation in Cheltenham is 4.0 kW.
  • A megawatt hour (MWh) is the energy produced by running at 1 MW for an hour. The average Cheltenham home used 3,169 kWh of electricity in 2024, about 3.2 MWh.

Why Is Almost All of Cheltenham's Renewable Energy Solar?

  • Rooftop solar panels fit on homes and businesses in a built-up town. Wind turbines, solar farms and biomass plants need open land, which a built-up town mostly doesn't have.

Does This Include Solar Panels on Homes?

  • Yes. The installation and capacity figures count every registered installation, including panels on house roofs. The project map only includes larger projects, of 150 kW or more, that have been through the planning system.

What Do the Project Statuses Mean?

  • Operational: built and generating or storing power.
  • Under construction: being built.
  • Approved: has planning permission but hasn't been built yet. Some approved projects are never built.
  • In planning: an application or appeal is waiting for a decision.
  • Refused, withdrawn or ended: refused, withdrawn, abandoned, or with permission that has run out, or a plant that has since closed.

Why Are Batteries Included?

  • Battery storage sites don't generate electricity, but they store it when there's plenty, such as on a sunny afternoon, and release it when it's needed, which lets the grid use more solar and wind power. The planning database records them alongside renewable projects.

How Can I Find Out About a Planning Application in Cheltenham?

How Often Is This Page Updated?

  • We check for new figures every month. Installation and capacity figures are published once a year, in September, and the planning database every three months.

About This Data

Data from the Department for Energy Security and Net Zero's Regional Renewable Statistics and Renewable Energy Planning Database (July 2026), published under the Open Government Licence v3.0. Electricity use is from its subnational electricity consumption statistics. Last updated 31 October 2026, checked monthly. Distances are measured from the Promenade in the town centre. Generation figures that would reveal the output of a single site are not published.